Short description
Inis Oirr:
โ site clearance to enable construction of the works,
โ provision of site compound and storage area for materials and equipment,
โ provision of 3 No. raw water tanks with a minimum total liquid volume of 9,470 m, completed with foundations and supports,
โ provision of scour and overflow pipelines,
โ provision of new tanks and hardstand drainage,
โ provision of 1 No. reverse osmosis water feed tank,
โ provision of chemical storage units complete with hard standing areas,
โ decommission of existing on-site raw water abstraction facility,
โ reinstatement and landscaping works,
โ all civil, mechanical and electrical works required under this scope,
โ all pipelines, valves, instrumentation required under this scope,
โ provision of telemetry /control system to integrate with existing control and monitoring system,
โ design, supply, installation, construction, testing and commissioning of the works; services.
Refer to ITT Document.