Airfield Jointing Maintenance Works at Dublin Airport
The works, more particularly described in the document attached to this notice, generally consist of:
โ Cleaning out and removal of life expired pavement jointing and subsequent reinstatement with airfield quality jointing material to the highest quality for the proposed aircraft traffic.
โ Adhoc minor patch repair works as and where required for spalled jointing edges and corner cracks with an approved resin based, flexible material repair material.
โ Preparation and installation of high performance joints between bitumen and concrete surfaces.
Deadline
The time limit for receipt of tenders was 2017-09-18.
The procurement was published on 2017-08-15.
Who?
What?
Where?
Procurement history
Date |
Document |
2017-08-15
|
Contract notice
|