Marine Consultant — Celtic Interconnector Project
EirGrid and RTE have completed the Feasibility Phase of the Celtic Interconnector project and have recently entered into the Initial Design & Pre-Consultation Phase of the project.
There is now a requirement to procure a marine consultant to provide technical expertise for the development of the offshore elements of the project, in particular the planned marine surveys and marine engineering studies.
The marine consultant expertise should cover following fields:
— Marine engineering studies for cable installation. Developed knowledge of the related technical, environmental and legal constraints, plus the associated detailed studies.
— Submarine power cable installation (laying and protection). Experience of installation works methods and equipment.
— International offshore power cable project management.
See the Information Memorandum and Pre-Qualification Questionnaire for full details. This is attached to the etenders notice for this tender at
www.etenders.gov.ie
Deadline
The time limit for receipt of tenders was 2017-01-09.
The procurement was published on 2016-12-07.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Who?
What?
Where?
Procurement history
Date |
Document |
2016-12-07
|
Contract notice
|
2017-09-08
|
Contract award notice
|