Irish Water plans to undertake the development of three existing Water Treatment Plants (WTPs) together with associated Source, Reservoirs and Pipeline works as part of the Tullamore and Birr Water Supply Schemes Project.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design, Build and Operate (โDBOโ) Contract.
Deadline
The time limit for receipt of tenders was 2016-08-10.
The procurement was published on 2016-06-29.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Object Scope of the procurement
Title: 16/097 โ Tullamore and Birr Water Supply Schemes Project.
16/097
Products/services: Water-treatment plant construction work๐ฆ
Short description:
โIrish Water plans to undertake the development of three existing Water Treatment Plants (WTPs) together with associated Source, Reservoirs and Pipeline...โ
Short description
Irish Water plans to undertake the development of three existing Water Treatment Plants (WTPs) together with associated Source, Reservoirs and Pipeline works as part of the Tullamore and Birr Water Supply Schemes Project.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design, Build and Operate (โDBOโ) Contract.
Complementary information Original notice reference
Notice number in the OJ S: 2016/S 126-225681
Changes Text to be corrected in the original notice
Section number: IV.2.2
Place of text to be modified: Time limit for receipt of tenders or requests to participate
Old value
Date: 2016-08-10 ๐
Time: 12:00
New value
Date: 2016-08-17 ๐
Time: 12:00
Other additional information
โ16/097 โ Birr & Tullamore Water Supply Schemes
Dear Sir/Madam,
Further to our EU Journal advertisement (OJEU ref: 2016/S 126-225681) for the above mentioned...โ
16/097 โ Birr & Tullamore Water Supply Schemes
Dear Sir/Madam,
Further to our EU Journal advertisement (OJEU ref: 2016/S 126-225681) for the above mentioned tender, and your subsequent response, please find attached clarifications to date.
The closing time for queries is not later than 12:00 (local time) Thursday 4.8.2016.
Verbal queries will not be entertained.
Two (2) signed hard copies and two (2) CDs, containing the same information in electronic format (in MS Word or MS Excel) of your completed Qualification Submission must be returned for the attention of: The Shared Services Procurement Manager, Ervia, PO Box 900, Webworks Cork, Eglinton Street, Cork, Ireland Not later than 12.00 (local time) Wednesday 17.8.2016.
Please confirm receipt of this e-mail.
Regards,
Orla Smyth
Capital Works Buyer
Ervia.
Show more
Source: OJS 2016/S 142-257002 (2016-07-22)
Additional information (2016-08-15) Contracting authority Name and addresses
Postal address: The Shared Services Procurement Manager, Ervia, P, Co.Cork
Changes Text to be corrected in the original notice
Section number: IV.2.2
Old value
Date: 2016-08-17 ๐
Time: 12:00
New value
Date: 2016-08-23 ๐
Time: 12:00
Other additional information
โ16/097 โ Birr & Tullamore Water Supply Schemes
Dear Sir/Madam,
Further to our EU Journal advertisement (OJEU ref: 2016/S 126-225681) for the above mentioned...โ
16/097 โ Birr & Tullamore Water Supply Schemes
Dear Sir/Madam,
Further to our EU Journal advertisement (OJEU ref: 2016/S 126-225681) for the above mentioned tender, and your subsequent response, please find attached clarifications to date.
The closing time for queries is not later than 12:00 hours (local time) Thursday 4.8.2016.
Verbal queries will not be entertained.
Two (2) signed hard copies and two (2) CDs, containing the same information in electronic format (in MS Word or MS Excel) of your completed Qualification Submission must be returned for the attention of: The Shared Services Procurement Manager, Ervia, PO Box 900, Webworks Cork, Eglinton Street, Cork, Ireland Not later than 12:00 hours (local time) Tuesday 23.8.2016.
Regards,
Orla Smyth
Capital Works Buyer
Ervia.
Show more
Source: OJS 2016/S 158-286342 (2016-08-15)
Contract award notice (2019-07-15) Contracting authority Name and addresses
Postal address: The Shared Services Procurement Manager, Ervia, Co.Cork
Object Scope of the procurement
Title: 16/097 โ Tullamore and Birr Water Supply Schemes Project
16/097
Short description:
โIrish Water plans to undertake the development of 3 existing Water Treatment Plants (WTPs) together with associated source, reservoirs and pipeline works as...โ
Short description
Irish Water plans to undertake the development of 3 existing Water Treatment Plants (WTPs) together with associated source, reservoirs and pipeline works as part of the Tullamore and Birr water supply schemes project.
The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and Regulations relating to treated water for human consumption.
It is intended that the works will be implemented under a Design, Build and Operate (โDBOโ) contract.
Irish Water plans to undertake the development of 3 existing Water Treatment Plants (WTPs) together with associated source, reservoirs and pipeline works as part of the Tullamore and Birr water supply schemes project.The planned works are necessary to ensure compliance with EU Directives, Irish National Standards and regulations relating to treated water for human consumption.It is intended that the works will be implemented under a DBO contract.
Show more Information about options
Options โ
Description of options: Option to extend by 36 months.
Description
Additional information:
โDocuments are available to all candidates who register their interest through etenders. All queries for clarification must be submitted via email to...โ
Additional information
Documents are available to all candidates who register their interest through etenders. All queries for clarification must be submitted via email to Tenders@ervia.ie. The questionnaire must be completed and returned to the address detailed in the attached document not later than 12:00 Wednesday 10.8.2016.
Procedure Type of procedure
Negotiated procedure with prior call for competition
Administrative information
Previous publication concerning this procedure: 2016/S 126-225681
Award of contract
1๏ธโฃ
Contract Number: 1
Title: Tullamore and Birr Water Supply Schemes Project
Date of conclusion of the contract: 2018-09-20 ๐
Information about tenders
Number of tenders received: 2
Name and address of the contractor
Name: Murphy Process Engineering Ltd
Postal town: Co Kildare
Country: Ireland ๐ฎ๐ช
Region: รire/Ireland๐๏ธ
The contractor is an SME
Complementary information Additional information
โDocuments are available to all candidates who register their interest through etenders. All queries for clarification must be submitted via email to...โ
Documents are available to all candidates who register their interest through etenders. All queries for clarification must be submitted via email to Tenders@ervia.ie. The questionnaire must be completed and returned to the address detailed in the attached document not later than 12:00 Wednesday 10.8.2016.
Show more Review body
Name: The High Court
Postal address: High Court Central Office, Four Courts, Inns Quay
Postal town: Dublin
Country: Ireland ๐ฎ๐ช
Phone: +35 318886000๐
E-mail: highcourtcentraloffice@courts.ie๐ง
URL: http://www.courts.ie๐ Review procedure
Precise information on deadline(s) for review procedures:
โInterested parties are referred to Statutory Instrument 131 of 2010, European Communities (Award of Contracts by Utility Undertaking) (Review Procedures)...โ
Precise information on deadline(s) for review procedures
Interested parties are referred to Statutory Instrument 131 of 2010, European Communities (Award of Contracts by Utility Undertaking) (Review Procedures) Regulations 2010 (and in particular Regulation 7 and 10(2).
Show more
Source: OJS 2019/S 137-338472 (2019-07-15)