N70 Sneem to Blackwater Bridge Road Project — Engineering and Environmental Consultancy Services
The scope of services required by Kerry County Council consists of all services necessary or desirable for the purposeful management and delivery of Phases 3 and 4 of the National Roads Authority (NRA)‘s Project Management Guidelines 2010 (NRA PMG 2010) in relation to the N70 Sneem to Blackwater Bridge Road Project.
The project comprises of the on-line widening / realignment of the existing N70 to provide a Type 3 Single Carriageway Road with cycle facilities over a distance of approximately 4.4 km.
Approximately 1.55 km of the project has been improved in recent times and has a paved width which varies between 8 metres and 9.5 metres.
There are no specific cyclist facilities at these locations. The quality of the remainder of the existing road is significantly poorer with substandard paved width, alignment and surface.
These sections have not seen any significant improvement in recent times other than surface maintenance.
Deadline
The time limit for receipt of tenders was 2015-09-04.
The procurement was published on 2015-07-23.
Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Who?
What?
Procurement history
Date |
Document |
2015-07-23
|
Contract notice
|
2016-01-19
|
Contract award notice
|