Mechanical and Electrical Services Upgrade

Crystal Sport and Leisure Centre

The works consists of the upgrade and replacement of existing mechanical services installation along with the introduction of a combined heat and power system to improve efficiency and reduce the overall annual running costs for the crystal Leisure Centre, Cork Road, Co. Waterford. The Crystal Sports and Leisure Centre is a 2-storey building comprising of the following:
โ€” 25 metre indoor swimming pool,
โ€” Changing rooms,
โ€” Sauna,
โ€” Sports Hall,
โ€” Bar,
โ€” Kitchen,
โ€” Cafรฉ/Restaurant.
The main plant and equipment was installed in 1998 and has been poorly maintained in the interim. There are 3 main mechanical plant areas:
a) Mechanical boiler plant room located on the ground floor,
b) Swimming pool filtration room adjacent to boiler room at ground floor level,
c) AHU Swimming pool and changing areas located on flat roof above the gym.

Deadline
The time limit for receipt of tenders was 2015-09-04. The procurement was published on 2015-08-28.

Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Who?

What?

Where?

Procurement history
Date Document
2015-08-28 Contract notice
2016-06-14 Contract award notice
Related searches ๐Ÿ”