ESB plans to develop up to 12 wind farms (up to circa 300 MW - with the potential that this may extend to 500 MW - in aggregate) in the period from Q4, 2014 to Q4, 2019.
The potential scale of these individual windfarm developments is that they are expected to typically range between 15 MW & 50 MW.
This call for competition is to establish a framework agreement. The scope of work envisaged for this framework agreement includes design, civil and electrical works (connected at MV to HV) for ESB's wind farm projects during the tenure of the framework term.
The framework term will be a maximum of 5 years, comprised of a 3 year initial term with the right to extend to by a further 2 years at the discretion of ESB.
Deadline
The time limit for receipt of tenders was 2014-04-11.
The procurement was published on 2014-03-07.
Contract award notice (2017-09-01) Contracting authority Name and addresses
Name:
โESB and/or its Subsidiaries, Associates and Joint Venture Partnerships (hereinafter referred to as ESB)โ
Postal address: Two Gateway, East Wall Road
Postal town: Dublin
Postal code: D03 A995
Country: Ireland ๐ฎ๐ช
Contact person: Paula Carey
Phone: +353 17027630๐
E-mail: powergeneration.procurement@esb.ie๐ง
Region: รire/Ireland๐๏ธ
URL: www.esb.ie๐
Object Scope of the procurement
Title: Framework for ESB Wind Farms Electrical Balance of Plant.
PG108T908
Products/services: Engineering works and construction works๐ฆ
Short description:
โContract Notice for Framework Agreement for Electrical Balance of Plant for ESB Wind Farms. The scope of work envisaged for this framework agreement...โ
Short description
Contract Notice for Framework Agreement for Electrical Balance of Plant for ESB Wind Farms. The scope of work envisaged for this framework agreement includes design, civil and electrical works (connected at MV to HV) for ESB's wind farm projects during the tenure of the framework term.
1๏ธโฃ
Place of performance: รire/Ireland๐๏ธ
Main site or place of performance: Island of Ireland including Republic of Ireland and Northern Ireland.
Description of the procurement:
โFramework Agreement for Electrical Balance of Plant for ESB Wind Farms. ESB is undertaking to develop up to 12 wind farms (up to circa 300 MW โ with the...โ
Description of the procurement
Framework Agreement for Electrical Balance of Plant for ESB Wind Farms. ESB is undertaking to develop up to 12 wind farms (up to circa 300 MW โ with the potential that this may extend to 500 MW โ in aggregate). The potential scale of the individual wind farm developments is expected to range between 15 MW and 100 MW. The scope of work envisaged for this framework agreement includes design, civil and electrical works (connected at MV to HV) for ESB's wind farm projects during the tenure of the framework term. The framework term is for a maximum of 5 years, comprised of a 3 year initial term with the right to extend by a further two years at the discretion of ESB.
Show more
Additional information: This is a Contract Award Notice.
Procedure Type of procedure
Negotiated procedure with prior call for competition
Information about framework agreement
The procurement involves the establishment of a framework agreement
Administrative information
Previous publication concerning this procedure: 2014/S 050-084187
Award of contract
1๏ธโฃ
Contract Number: 1
Title: PG108T908 Framework for EBoP Works for ESB Wind Farms
Date of conclusion of the contract: 2017-08-04 ๐
Complementary information Review body
Name: The High Court (after consultation with ESB)
Postal address: Chief Registrar, Four Courts, Inns Quay
Postal town: Dublin
Postal code: 7
Country: Ireland ๐ฎ๐ช
Source: OJS 2017/S 169-347593 (2017-09-01)