2014PO28 - Suitability Assessment Process (Restricted Procedure (OJEU)) for Completion and Fit-out Works at North Wall Quay for Central Bank of Ireland

Central Bank of Ireland

The CBoI is seeking to complete construction of the partially built reinforced concrete structure, located on North Wall Quay (NWQ), Dublin 1, and fit-out for a quality specification, fit for purpose office building that will accommodate CBoI city centre operations and personnel in one centralised location.
The existing building is an 8 storey building over double basement, with a gross internal floor area of circa 37,000sqm, (which includes circa 12,000sqm of double basement) with provisions for car park, access ramp, flood defences, pavement upgrade works and general external works.
The successful Applicant will be required to carry out the following, amongst other:
1. Install piling foundation / drainage / attenuation tanks / floor slabs and any underground services.
2. Construct basement ramp / basement levels / perimeter wall
3. Complete construction of structural frame at roof level and undertake minor structural alterations at each floor level
4. Design and Installation of faรงade to ensure the building envelope is an extremely high standard.
5. Fit-out of all Floor Plates to clients requirements, including M&E installation, catering, IT/AV, security and other specialist installation,
6. Complete all ancillary external / site work including high quality hard and soft landscaping,
7. Handover (Including phased handover of the Works) of the new building to the satisfaction of the Employer's Representative, Assigned Certifier and Central Bank of Ireland.
The CBoI anticipates that the property, when completed, will achieve, as a minimum, a BREEAM excellent rating via the provision of appropriate sustainability solutions utilising a mixed mode ventilation strategy.
Refer to section 1.1 of the Suitability Assessment Questionnaire for more detailed description.

Deadline
The time limit for receipt of tenders was 2014-06-03. The procurement was published on 2014-04-29.

Suppliers
The following suppliers are mentioned in award decisions or other procurement documents:
Who?

What?

Where?

Procurement history
Date Document
2014-04-29 Contract notice
2015-10-08 Contract award notice