Two storey extension and refurbishment, Sancta Maria College, Ballyroan, Dublin 16
The scope of this contract involves the demolition of a 1947 single storey classroom wing, water tower and prefabs; construction of a 4 450 mยฒ extension to the 1970s school building compromising of single and two storey wings of staff and teaching accommodation, a general purpose hall, a PE hall, changing rooms, WC's, ancillary plant and storage, a new stage and fly tower to the existing assembly hall, 5 no. hardcourts, improvements to existing paths, roadways and drop off facilities, new gates to the existing Templeroan entrance, new entrance signage, 55 no. carparking spaces, bicycle parking, covered walkway, boundary fencing, landscaping and associated site works, and replacement of all windows to the 1970s school building at Sancta Maria College, which lies within the curtilage of a protected structure. The development will include making good external walls to ancillary buildings to Ballyroan House, where the 1947 building to be demolished adjoins, and upgrade of its access road as part of the improved access to the school.
The work also includes extensive refurbishment to the existing building which includes the following works:
โ Alterations to layouts.
โ Upgrade and Refurbishment of all areas throughout existing building.
โ Acoustic/fire sealing throughout.
โ Upgrade and joinery of existing doors.
โ Replacement of all ceilings.
โ New floor finishes throughout.
โ Upgrading of Mechanical and Electrical Services throughout.
โ Re-decoration throughout.
โ Remedial work to external elevations and hard landscaping works.
Deadline
The time limit for receipt of tenders was 2013-09-09.
The procurement was published on 2013-08-03.
Who?
What?
Where?
Procurement history
Date |
Document |
2013-08-03
|
Contract notice
|