For the Provision of Design Services and Contractor Selection for a new Production Facility and Associated Works
Medite intend to build a facility for the preparation of wood chip which will be used in the manufacture of a recently developed new product, Medite Tricoya. The proposed location for the new facility will be on a specific part of the existing site and will be carried out with only the minimum of interaction or disruption to the normal production plant operation. It is estimated that the area required for the new facility will be approximately 15 000m.
Deadline
The time limit for receipt of tenders was 2013-04-05.
The procurement was published on 2013-03-05.
Who?
What?
Where?
Procurement history
Date |
Document |
2013-03-05
|
Contract notice
|