Longford Sewerage Scheme Phase 2 - Preliminary Design Stage
Longford County Council requires the services of a competent Consulting Engineer experienced in the field of wastewater collection, treatment and disposal to carry out services for the Preliminary Design Stage to determine the future strategy for the Longford Sewerage Scheme.
The Longford Sewerage Scheme Phase 2 Preliminary Design Stage will involve a Consulting Engineer carrying out an investigation of the Longford Wastewater Treatment Plant as well as the drainage catchment of Longford Town and its environs to identify hydraulic, environmental, structural and operational issues, and also the construction and verification of a hydraulic model of the collection network in order to assess the wastewater collection, treatment and disposal needs to cater for the townโs requirements over the next 20 years.
NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at
http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=420572.
Deadline
The time limit for receipt of tenders was 2012-06-07.
The procurement was published on 2012-05-01.
Who?
What?
Where?
Procurement history
Date |
Document |
2012-05-01
|
Contract notice
|
2012-05-31
|
Additional information
|