Pipeline to Great Island Power Station, Co. Wexford
Bord Gรกis รireann is seeking applications from suitably experienced contractors to construct a natural gas pipeline from Baunlusk AGI near Co. Kilkenny to Great Island Power Station, Co. Wexford. The pipeline length is approximately 45 km. The diameter of the pipeline is in a range of 300 mm to 500 mm. The majority of this pipeline will be located in a cross country environment. The project also involves modifications to the existing AGIโs and inclusion of block valve(s) along the route. The scope of work will involve all activities associated with the construction of Natural Gas Transmission Pipelines and Associated Installations, at up to 85 bar pressure. The scope of work includes but is not necessarily limited to the following: Carrying out all construction activities associated with the laying of High Pressure Steel Gas Mains, in cross country, and suburban environments, including preparation of the working width, pipe stringing, excavation, negotiation of existing services, ditching, backfilling, and reinstatement, and other associated works. Carrying out all construction activities associated with the welding of High Pressure Steel Gas Mains, including submission of welding procedures, welder qualification, all welding, radiography, radiographic interpretation, wrapping of joints, pigging of pipelines, hydrostatic testing, and commissioning. Carry out all construction activities associated with the construction of Above Ground Installations, including provision of all ancillary civil services, fabrication of all pipework, tie-ins to mains, testing, commissioning, and other associated works. Provision of adequate resources with the requisite experience, to ensure that all pipeline and installation works contracts are completed on programme and in accordance with BGE Specifications and Conditions of Contract. Fulfilling the role Project Supervisor Construction Stage (PSCS) under the Safety, Health and Welfare at Work (Construction) Regulations 2006. Liaison with all Local Authorities and other parties on an ongoing basis in advance of and for the duration of the construction contract. Provision of adequate resources and plant to carry out crossings at special locations, such as Motorways, Canals, Railways, and Major Rivers. The Contractor may also be required to carry out construction activities to install fibre optic ducting and access chambers along some or all of the proposed route of the natural gas pipeline, including the special locations, such as Motorways, Canals, Railways, and Major Rivers. The scope of work will also involve all activities associated with the installation of a natural gas pipeline of around 1 km by trenchless crossing in order to cross the River Barrow Estuary. In order to receive the Pre qualification questionnaire please forward your Expression of Interest for the attention of The Networks Procurement Manager to
cwhite@bge.ie.
Note: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at
http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=192970.
Deadline
The time limit for receipt of tenders was 2011-03-02.
The procurement was published on 2011-01-28.
Who?
What?
Where?
Procurement history
Date |
Document |
2011-01-28
|
Contract notice
|
2011-02-23
|
Additional information
|