PG108T773 - Booster Fan Motors Moneypoint

ESB Power Generation

The contract is for the supply of up to four 6.6kV industrial motors as per the criteria outlined below (all values indicative only). Prospective tenderers should have experience in design and manufacturer of these motors and be able to provide on site technical assistance for the installation. The function of these motors is to drive a centrifugal fan which is directly coupled. The motors will be required to carry out multiple starts within a one hour period.
Power 5000kW.
Voltage 6600V.
Insulation Class /deltaT F/B.
Current 500A.
Starting Type DOL.
Frequency 50Hz.
Speed 750rpm.
Installation Outdoor.

Deadline

The time limit for receipt of tenders was 2011-04-27. The procurement was published on 2011-03-23.

Suppliers

The following suppliers are mentioned in award decisions or other procurement documents:

Who? What? Where?
Procurement history
Date Document
2011-03-23 Contract notice
2012-02-09 Contract award notice
Contract notice (2011-03-23)
Object
Scope of the procurement
Title: electric motors
Quantity or scope:
โ€œThe contract is for the supply of up to four 6.6kV industrial motors as per the criteria outlined below (all values indicative only). Prospective tenderers...โ€    Show more
Notice metadata
Original language: English ๐Ÿ—ฃ๏ธ
Document type: Contract notice
Nature of contract: Supplies
Regulation: European Union, with participation of GPA countries
Common procurement vocabulary (CPV)
Code: Electric motors ๐Ÿ“ฆ

Procedure
Procedure type: Negotiated procedure
Type of bid: Submission for all lots
Award criteria
The most economic tender

Contracting authority
Identity
Country: Ireland ๐Ÿ‡ฎ๐Ÿ‡ช
Awarding authority type: Utilities entity
Postal address: 27 Lower Fitzwilliam Street
Postal code: 2
Postal town: Dublin
Contact
Internet address: http://www.esb.ie ๐ŸŒ
E-mail: powergeneration.procurement@esb.ie ๐Ÿ“ง
Phone: +353 214656637 ๐Ÿ“ž
Fax: +353 16384603 ๐Ÿ“ 

Reference
Dates
Date dispatched: 2011-03-23 ๐Ÿ“…
Submission deadline: 2011-04-27 ๐Ÿ“…
Publication date: 2011-03-25 ๐Ÿ“…
Identifiers
Notice number: 2011/S 59-096190
OJ-S issue: 59
Additional information

โ€œa) It is ESB Power Generation's intention to short-list suitable candidates. b) ESB Power Generation will not be responsible for costs, charges or expenses...โ€    Show more
Source: OJS 2011/S 059-096190 (2011-03-23)
Contract award notice (2012-02-09)
Object
Notice metadata
Document type: Contract award notice

Procedure
Type of bid: Not applicable

Contracting authority
Identity
Awarding authority name: ESB Power Generation
Postal town: Dublin 2

Reference
Dates
Date dispatched: 2012-02-09 ๐Ÿ“…
Publication date: 2012-02-14 ๐Ÿ“…
Identifiers
Notice number: 2012/S 30-048032
Refers to notice: 2011/S 59-096190
OJ-S issue: 30
Source: OJS 2012/S 030-048032 (2012-02-09)