Supplier: Mitsubishi Electric Ireland

One archived procurement

Recent procurements where the supplier Mitsubishi Electric Ireland is mentioned

2017-09-18   Design, specify and supply an AC to AC power take off and control system for 25 kW Hydro-kinetic Turbine (Design Pro Ltd)
DesignPro is developing a prototype 25 kW hydro-kinetic turbine to convert kinetic energy in water flows to electrical power. The design of unit incorporates 2 hydro-kinetic turbines that each drive standard induction motors via an in line gearbox to generate 3 phase AC power. The power output varies with the rotation of the turbines. DesignPro requires an integrated PLC control system + AC to AC power take off system that can utilise the operational parameters of standard 3 phase induction motors to โ€ฆ View the procurement ยป
Mentioned suppliers: Mitsubishi Electric Ireland