2022-04-19   Framework for the design, supply, manufacture, installation, commissioning, maintenance and enhancement of a new... (daa plc)
Currently Dublin Airport is operating at Level 2 A-SMGCS (Advanced Surface Movement Guidance System) as defined by Euro control. The airport has developed a master plan to realise higher levels of A-SMGCS (Level 4 -Conflict Resolution, Automatic Planning & Guidance) and โ€œFollow the Greenโ€ type operations over a number of years if required by the business. To implement these higher levels of A-SMGCS will require the introduction of individual lamp control and monitoring technology which is not currently โ€ฆ View the procurement ยป
2016-03-15   Pre-Qualification Questionnaire (PQQ) for Construction Works relating to Runway 06/24 Rehabilitation and Associated... (Shannon Airport Authority plc)
Shannon Airport Authority (SAA) wishes to appoint a suitably qualified and experienced Contractor to deliver the Runway 06/24 Rehabilitation and Associated Works project at Shannon Airport. View the procurement ยป
Mentioned suppliers: Lagan Asphalt Ltd
2012-12-17   Irish Aviation Regulator - Creation of panel to advise the Irish Aviation Regulator on price caps and other economic issues (Commission for Aviation Regulation)
The Commission for Aviation Regulation (CAR) regulates airport charges at Dublin Airport and aviation terminal charges at Dublin, Shannon and Cork Airports. It invites expressions of interest from consultants that would like to be on a general panel from which tenders will be invited to assist the CAR in its role as an economic regulator. This panel will last until 31 December 2015. During this period - a new determination on airport charges at Dublin airport is due no later than 31 December 2014. - The โ€ฆ View the procurement ยป
2012-03-21   New runway end safety areas at Kerry Airport (Kerry Airport PLC)
The main works subject to this contract contain the following: โ€” Threshold 26 relocation, โ€” CAT I approach lighting system relocation, โ€” Eastern RESA extension to approximately 150mx240m, โ€” Western RESA extension to approximately 150mx240m, โ€” Construction of concrete box to channel open drain, โ€” Construction of Eastern runway turn pad extension, โ€” Construction of Western runway turn pad extension, โ€” Installation of runway guard lights, โ€” Relocation of PAPI, โ€” Relocation of glide path, โ€” Reparation of โ€ฆ View the procurement ยป