2017-08-15Airfield Jointing Maintenance Works at Dublin Airport (daa plc)
The works, more particularly described in the document attached to this notice, generally consist of:
โ Cleaning out and removal of life expired pavement jointing and subsequent reinstatement with airfield quality jointing material to the highest quality for the proposed aircraft traffic.
โ Adhoc minor patch repair works as and where required for spalled jointing edges and corner cracks with an approved resin based, flexible material repair material.
โ Preparation and installation of high performance โฆ
View the procurement ยป