Recent procurements by Errew NS Board of Management
2023-08-09Errew NS - Resurfacing of Existing Playground (Errew NS Board of Management)
The existing tarmacadam surfaces and kerbs are required to be excavated and removed off site. Various existing drainage is to be replaced/repaired. Extra storm water gullies are required in three locations. Re-surfacing, new kerbs and all associated works to be carried out.
View the procurement ยป