Procurements: CBS Secondary School (New Ross)

4 archived procurements

CBS Secondary School (New Ross) has historically been a buyer of architectural, construction, engineering and inspection services, engineering services, and engineering design services.

Recent procurements by CBS Secondary School (New Ross)

2019-10-17   Civil Structural Engineering Services for Additional Accommodation at CBS New Ross (CBS Secondary School (New Ross))
Civil structural engineering services for additional accommodation at CBS New Ross comprising: โ€” 3 additional general classrooms 175,8 m, โ€” 1 general classroom to replace existing prefab 58,6 m, โ€” 1 DCG Room 88,6 m, โ€” 1 Home Economics Room 118,6 m, โ€” special education tuition room m, โ€” student and staff toilets 38 m, โ€” locker space 50,4 m. Giving gross floor area including circulation and partitions: 701,4 m. View the procurement ยป
2019-10-17   Building Services (M&E) Engineering Services for Additional Accommodation at CBS New Ross (CBS Secondary School (New Ross))
Building services (M&E) engineering services for additional accommodation at CBS New Ross comprising: โ€” 3 additional general classrooms 175,8 m, โ€” 1 general classroom to replace existing prefab 58,6 m, โ€” 1 DCG Room 88,6 m, โ€” 1 home economics room 118,6 m, โ€” special education tuition room m, โ€” student and staff toilets 38 m, โ€” locker space 50,4 m. Giving Gross Floor Area including circulation and partitions: 701,4 m. View the procurement ยป
2019-10-16   Quantity Surveying Services for Additional Accommodation at CBS New Ross (CBS Secondary School (New Ross))
Quantity surveying services for additional accommodation at CBS New Ross comprising: โ€” 3 additional general classrooms 175,8 m, โ€” 1 general classroom to replace existing prefab 58,6 m, โ€” 1 DCG Room 88,6 m, โ€” 1 home economics room 118,6 m, โ€” special education tuition room m, โ€” student and staff toilets 38 m, โ€” locker space 50,4 m. Giving gross floor Area including circulation and partitions: 701,4 m. View the procurement ยป
2019-10-16   Architectural Services for Additional Accomodation at CBS New Ross (CBS Secondary School (New Ross))
Architectural services for additional accomodation at CBS New Ross comprising: โ€” 3 additional general classrooms 175,8 m, โ€” 1 general classroom to replace existing prefab 58,6 m, โ€” 1 DCG room 88,6 m, โ€” 1 home economics room 118,6 m, โ€” special education tuition room m, โ€” student and staff toilets 38 m, โ€” locker space 50,4 m, Giving gross floor area including circulation and partitions: 701,4 m. View the procurement ยป